<正>1 Information of operation and production Operation person:Present chief operators are 8 persons,operators are 8 persons;New chief operators are () persons,new operator is 4person;Training chief operators are 2 persons,training operators are 4 persons;Transferred chief operator is 0 person;Transferred operator is 0 person.Operation data:Times of operation are 15;Times of unplanned shutdown are 2;Operation duration is 2 470.4 h (3.5 MW);