<正>1 Reactor operation China Advanced Research Reactor (CARR)has over fulfilled the annual operation target in2019,the accumulated operation time is 58 d,the maximum stable operation power is 40 MW and the total energy released is 1 233.75 MW·d.
论文目录
文章来源
类型: 期刊论文
作者: ZUO Yanci,LI Xuehui
来源: Annual Report of China Institute of Atomic Energy 2019年00期
年度: 2019
分类: 工程科技Ⅱ辑
专业: 核科学技术
单位: Division of Reactor Engineering Technology Research
分类号: TL411
页码: 239-240
总页数: 2
文件大小: 98K
下载量: 1